Skip to content

Costing

Know where the cost behind each margin comes from, and who can see it.

Updated 23 September 2026

Why
A margin is only real when the cost behind it is measured, not assumed.
What
Costs held against products, stock, machines, operators, service steps and delivery runs, each from a real figure.
How
Work is timed where it happens and costed at your rates; a job missing a rate shows the gap.

Where it appears

AreaWhat you seeBrought by
OrdersLanded unit cost on goods in against a purchase orderSales Engineer, Design Engineer, Service Centre, Wizard, Commerce, Route, Source and Machinist
CatalogueA cost on every product, accepted from supplier pricesSales Engineer, Wizard, Commerce, Source and Stock
StockA moving average unit cost on every stock lineStock
ServicingStandard against actual minutes per step, with labour and machine ratesService Centre
DesignA cutting cost from the shop's own cut chartDesign Engineer
MachinistJob cost per machine and operator on the Costs screenMachinist
RouteA run's cost shared across the deliveries it carriedRoute

Who sees cost

Costs and margins in Servicing, Machinist, Stock, Suppliers' prices and purchase orders are shown to the engineer role and above, and operators see neither. A quote line's margin, read from the cost copied onto the line, shows to everyone who can open the quote. See Roles.

The detail lives in Pricing and costing

A missing rate is shown as missing, never costed at zero. Set the rate and the cost appears.