Costs

Read what a finished job cost and where the figure is incomplete.

Updated 23 September 2026

Why
A quote is only as good as what the last job really cost.
What
The Costs view prices each finished job from its measured minutes, the machine and labour rates and the material it consumed.
How
Open /app/machinist/costs, pick the dates and read by job, machine, operator or month.

How a job is costed

PartWorked out as
MachineThe machine's hourly rate over the measured minutes
LabourThe operator's hourly rate over the same minutes
MaterialWhat the run consumed, at the moving average cost on the stock line
Job costThe three added together
MarginThe order line price less the job cost, where the job carries an order line

Standard and Actual set the planned minutes against the measured ones. Open a row to see the job's time and trail. Rates carry an effective date, so a rate rise does not rewrite last month.

Read it

  1. Step 1.

    Open /app/machinist/costs. It lists the done and scrapped jobs in a window that ends today.

  2. Step 2.

    Change From and To for another window.

  3. Step 3.

    Switch between By job, By machine, By operator and By month.

When a figure is missing

  • No rate: the machine or the person has no rate, so that part is left out and the total is what is known.
  • No margin: a margin needs the order line a job was raised from, and the jobs the machine modules and the AI interface raise carry none.
  • An Arcline job shows no material: the ledger records a cut against the sheet, not the job.

Costs and margins are for engineers and above. A missing figure is shown as missing, never as a zero.