Only in this combination
Costing in Machinist
Machinist costs each job against the machine and the operator that ran it, measured minutes beside the standard, totalled by machine and month.
Only here
What this pair adds
What a job cost against its machine and operator, standard against measured minutes, rolled up per machine, operator and month
- Finishing or pausing a job records its minutes.
- A missing rate produces a stated gap, never a zero.
- Members without cost sight see a sentence, not blanks.
The Machinist Machines view with 2 machines as stations, 3-axis vertical machining centre 500, CNC lathe 200 swing, each with its hourly rate and utilisation stated as not known until scans measure it.
Demonstration data