Skip to content
KABAIDO

Only in this combination

Activity in Machinist

When a machine station moves a job, the event carries the station and the minutes flow into costing against that station and its operator.

Only here

What this pair adds

A job moved at a machine station is one trace event carrying the station, and its measured minutes land on costing

  • Minutes are costed against the station and the operator.
  • Started is recorded when a queued shop run begins.

A machine station, 3-axis vertical machining centre 500, scanning job KAB-J26-00001 in and then out, each scan landing on the job's trail.

Station out: the minutes between are the job's time.

Demonstration data