Skip to content
KABAIDO

Platform part

Costing

Costs held against products, stock, machines, operators, service steps and delivery runs, each from a real figure.

A balustrade priced by the design engine at its defaults: 6 priced lines, each with its working, £519.54 before VAT on the preset's example rates.

From the live engine

Why and how

Why
A margin is only real when the cost behind it is measured, not assumed.
How
Work is timed where it happens and costed at your rates; a job missing a rate shows the gap.

Where it appears

  • OrdersLanded unit cost on goods in against a purchase order
  • CatalogueA cost on every product, accepted from supplier prices
  • StockA moving average unit cost on every stock line
  • ServicingStandard against actual minutes per step, with labour and machine rates
  • DesignA cutting cost from the shop's own cut chart
  • MachinistJob cost per machine and operator on the Costs screen
  • RouteA run's cost shared across the deliveries it carried

How it works

  • Standard against measured minutes

    A machine job's minutes are written when it finishes or pauses, then rolled up per machine, operator and month against the standard.

  • Stock at moving average

    Each receipt recomputes a line's moving average cost; each movement carries its cost, seen only by roles that see cost.

  • Priced from the model

    A design is priced line by line from your own rates and stock, flagged while example rates remain.

Questions